In January-June 2022, 494.1 km of water supply networks were put into operation in the Republic of Uzbekistan, which is 115.6 % compared to the corresponding period of 2021. It should be noted that 76.6 % or 378.5 km of commissioned water supply networks are located in rural areas.
For the current period, 24.2 km of networks were put into operation through the gas pipeline, which is 101.7 % compared to the corresponding period last year. The share of gas networks put into operation in rural areas was 63.6 %, or 15.4 km.


